Arrow City manhattan Project Real (Legal) or Fake (illegal)

Hello Sir,

I have recently purchased 2 BHK Flat in Arrow city Manhattan Project, Pen, Dist.-Raigad, Navi Mumbai. Web Address- “http://arrowgroup.us/”.
The Project dates back from 2007 and still in process of completion till date.
The Office persons there says that all the documents have recently been
cleared 31st march 2012 and possession will be given in 3 years of time and registration will be done in 2 months.So I purchased a flat in this Project, construction work is going on site and till date basement work is done.

But recently 25th June 2012 when I called them they say registration will be done in 1 years as for reason for delay they say first registration of that buyers will be done first who have booked long back. I think something wrong about whole process now and so want to file an RTI if u would help.

I would like to file an RTI to know whether Arrow Engineering Ltd. company is Registered and legal or not? And whether the company Arrow Engineering Ltd. has purchased all the land legally for the construction of their Mega housing Project Arrow city Manhattan at Village kandle,Tehsil Pen, Raigarh. In all the land purchased for the Arrow city Manhattan Project is legally been bought from Framers/Government, do the land is certified as Non-Agricultural land by the government, do the company Arrow Engineering Ltd. has 7\12
for the land purchased for the project and do they have all necessary permissions to go ahead and build a Mega township in Pen, does the project has approval from Authorized CIDCO officials or whoever is authorized to give permission for Housing projects in Navi mumbai Pen Area.

At last I want to file a single RTI for all of above from which i can know that I am investing in Legal and problem free Project i.e “Arrow city Manhattan”.

Navi Mumbai Office of Construction company:
Building No. 7, J Block, Platform Level, Belapur Commercial
Complex, CBD, Navi Mumbai
400614, Ph. 022-41127700
E-mail: arrowsales91@arrowgroup.us

Site Office :
Arrow City Manhattan, NH-17,
Village kandle,
Tehsil Pen,Raigarh
Mumbai MMR,Maharashtra.
07875069223,7875069224
E-MAIL: arrowsales9@arrowgroup.us

109 Responses to Arrow City manhattan Project Real (Legal) or Fake (illegal)

  1. sivanath says:

    you can file an rti reg this to the navi mumbai muncipal corporation (at most.check if it belongs to that area or any panchayat)

    you can ask for

    1.commencement certificate
    2.occupancy certificate(if occupied)
    3.plan sanctioned

    clearly mention the survey number plot number and name of the builder and address

    u need to draft it addressing it to public information officer

    check the link (as i dont understand hindi)
    http://www.nmmconline.com/web/guest/town-planning-department

    • KrishMehra85 says:

      Hi Sivanath, Thanks for your Reply. This means that you or your team will not file an RTI on behalf of me ? The Area belongs to Panchayat most probbably. If you would not file an RTI then pls say so…..

      • Amulya - RTI Anonymous Team Member says:

        Please read sivanath’s comments properly, nobody would be able to file an RTI without the information that he has asked for.

      • Dost says:

        Hi Krish,
        I am new here and working on my first RTI application with great help from other volunteers on the board.
        This board helps you in:
        1. Drafting your application, so that minimal chances of rejection happens on technical ground.
        2. Filing the RTI application anonymously (your application is filed by someone else in his own name and address and expenses and reply received shared on the board, to keep the identity of actual beneficiary a secret. To illustrate a benefit, suppose I have booked a property with a builder and file an RTI. If builder comes to know I have filed an RTI, he may try to harass me in various ways, but if someone from say Himachal Pradesh has filed an RTI, there is not much builder can do.
        I would recommend that you need to appreciate the efforts of the board. For every one RTI filed for you by the volunteers, you should file 2 RTIs for people looking for getting their anonymous RTIs filed.
        I request the team members to excuse me in case I have overstepped my limits and barged into this conversation.

    • KrishMehra85 says:

      Hello Everyone sorry for late reply, actually I got 7/12 papers of the land purchased by the arrow city people and I was trying to get the details like 1)The survey number, 2)Plot number etc but couldn’t find even after going through the papers twice, so I would request the team members that is there any lawyers in your group that can help me to unveil the information in the 7/12 papers that would help in filing RTI. And also do 7/12 papers have any vital information to file RTI to know the authenticity of the Project ? If any expert is present in this group for this matter(examinig 7/12 papers to find information to file RTI) please help me.

  2. KrishMehra85 says:

    Thanks for all your reply guys, and Sorry for replying late. Well I was confused and hence misunderstood the first reply which I got to my query. So correct me If I am wrong, for drafting my RTI. You need Information like “1)The survey number, 2)Plot number, 3)Name of the builder & address &4)Public information officer from the region where the construction is going on ?” Right Sivanath ? Pls mention all the information needed from me to file and RTI once again to avoid any more further misunderstanding and confusion if you need any more information pls mention it too as I don’t know the procedure of filing any RTI and hence don’t know what all information are required to do so.

    • Amulya - RTI Anonymous Team Member says:

      yes. you need all the four point to file your RTI properly.

      • KrishMehra85 says:

        Hi Amulya sorry for late reply, actually I got 7/12 papers of the land purchased by the arrow city people and I was trying to get the details like 1)The survey number, 2)Plot number etc but couldn’t find even after going through the papers twice, so I would request the team members that is there any lawyers in your group that can help me to unveil the information in the 7/12 papers that would help in filing RTI. And also do 7/12 papers have any vital information to file RTI to know the authenticity of the Project ? If any expert is present in this group for this matter(examining 7/12 papers to find information to file RTI) please advice what I should do.

  3. KrishMehra85 says:

    All right Amulya I will gather the required information soon and post it in reply here.

    • Amulya - RTI Anonymous Team Member says:

      sure.

      • arshalone says:

        This is really interesting… as i’ve seen lot many blogs talking about Arrow City but no one has the courage to actually see whats fishy about them & no one owned the responsibility to show the reallity… Keep it up Krish Mehra & Team Get — Hats of to you if can bring some light on the reality of Arrow City…

        • ikarma says:

          Arrow City Manhattan? No land! No Government Approval! No Proof!
          A lot of doubts about status of the Arrow City Manhattan – Panvel/Pen project. No work at site for more than FOUR years. The promoter has not been sharing any information about the project – proof of purchase of land by the Company, approval of building plan by Alibaug Town Planning Department, etc. There is little hope and serious doubt,

          Please write a letter to the company and take acknowledgement due asking for the following documents:
          (1) Copy of 7/12 extract of land on which the your building or plot is to located
          (2) Copy of Building proposal approved by the Town Planning Department, Alibaug
          (3) Allotment letter for your Flat/Plot
          (4) Copy of any latest approval or communication from any government department

          We request the investors to join the discussion group for update and sharing, email to Arrowcity(at)googlegroups(dot)com or ArrowCity.MahaMumbai(at)gmail(dot)com

  4. KrishMehra85 says:

    Hi guys,
    I had one query, actually Arrow city builders are constructing one big mega township and so they have acquired many land plots from 4-5 villages, so do you require 1)The survey number, 2)Plot number for all the purchased lands ? Can it be included in one single RTI application. Also the Address(residential) of builder is not known, only the site and other office addresses are known will it do ? They have given me xerox copies of saat bara of lands and other documents requesting Electric & water supply connection for township from Alibaug-Raigad municipal council. Also the PIO is difficult to find as the land doesn’t come under Navi mumbai Municipal council.

  5. arshalone says:

    Team,

    I think the detail which I could understand from the attachment is as follows.

    Current Owner : – Mr. Machinder Subhash Patil, Arrow Engineering Pvt Ltd

    Property Address: – Village Dhadpada, Survey No. 88, Hissa No. 2B, Taluka – Alibaugh

  6. KrishMehra85 says:

    No No guys,
    The Original owner of the whole Project is Vineet Malhotra -Managing Director – Arrow Engineering Ltd. which is New Delhi based company. Mr. Machinder patil purchased the land from farmers on behalf of Arrow company. Address of New Delhi company is
    Arrow Engineering Ltd
    B-3 & 4, Suneja Towers -1
    District Center Janak Puri
    New Delhi – 110058, Delhi
    India
    Tel:+91 11 45567768
    Fax:+91 11 45513891
    I am working on to find details like 1)The survey number, 2)Plot number, 3)Name of the builder & address &4)Public information officer from the region where the construction is going on to file an RTI asap, delay is due to lot of information need to be seen by me in the documents provided by them. Can any New Delhi person verify the authenticity of the Arrow Engineering Ltd. company, cause I found two Directors with same company name pls see the URL below.
    1)”http://www.esuppliersindia.com/arrow-engineering-ltd-/aboutus-p1705575-u1969150-swa.html”
    2)”http://in.kompass.com/MarketingViewWeb/appmanager/kim/IND_Portal?_nfpb=true&_windowLabel=T400314181316701202635&T400314181316701202635_actionOverride=%2Fflows%2FmarketingInformation%2FestablishmentMenu%2FgeneralInfoLinkSelected&T400314181316701202635profileSection=GI&T400314181316701202635companyCountry=IND&T400314181316701202635establishmentName=Arrow+Engineering+Ltd&T400314181316701202635establishementKid=IN781758&T400314181316701202635urlType=profile&_pageLabel=marketingInformation_establishmentProfilePage”
    Thanks Guys for any help u provide…

  7. ajitpol says:

    OP and others. Please join the Yahoo Arrow City Manhattan Home Owners Group at http://finance.groups.yahoo.com/group/acm-hog
    This discussion group was setup for benefit of plot and apartment buyers.

    Thanks OP for initiating the RTI process. We are very interested in the outcome.

    Regards,
    Ajit

  8. arrowgroup says:

    Sir

    This is great that you people are showing great intrest in our arrow city manhattan project at pen.
    Please email me your queries which you want to inquire by rti ,if possible i would be giving you all required documents like company details,7/12 extracts,government permissions,survey numbers,list of key personals etc so that you can verify these by rti also. Moreover we would also try to give you public relation officers adresses also so that you can easily seek reply.

    So please send me your email adresses so that we can start sending documents for inspection by you

    arrowsales9@gmail.com

    You can also visit our office at belapur,navi mumbai to inspect and recive these documents personally also.

    • KrishMehra85 says:

      Dear Mr. Arrowgroup,

      If you really want to help us in RTI then give us details like
      “1)The survey number,
      2)Plot number,
      3)Name of the builder & address &
      4)Public information officer from the region where the construction is going on ?”

      Hope u provide all of above considering as u are clear about all your legal land and development proceeding.

  9. KrishMehra85 says:

    Dear Mr. Arrowgroup,

    If you really want to help us in RTI then give us details like
    “1)The survey number,
    2)Plot number,
    3)Name of the builder & address &
    4)Public information officer from the region where the construction is going on ?”

    Hope u provide all of above considering as u are clear about all your legal land and development proceeding.

  10. arrowgroup says:

    Mr krish we have sent you details of land holdings,our other details also..please inform all the viwers of this blog for the same…and after rti reply also inform them….if any one requires this information about us please send us your request at email: arrowsales9@gmail.com

    • ikarma says:

      Has anyone filed RTI or got any details under RTI. Pl share.

      Arrow City Manhattan? No land! No Gov approval?
      There has been a lot of doubts and questions raised about the status of the Arrow City Manhattan – Panvel/Pen project. There has been no development at site for more than FOUR years. The promoter has not been sharing any information about the project – proof of purchase of land by the Company, approval of building plan by Alibaug Town Planning Department, and all other clearance related issues. There are news about the project being scrapped, although public continue to show interest and make bookings due to huge advertisement and publicity. The company has not been forthcoming about it work schedule at site. The Company sales representative has shown an 7/12 extract of land in the name of the promoter and not in the name of the Company. The Arrow City approval of 2008 is too old a document to understand its current status. It may have been scrapped subsequently. There was another document, known as search report for a piece of land by a private advocate. All these documents mean nothing in real terms. The company has started booing flats for 18 story buildings without even submitting a building proposal for approval to the Government. After waiting for a couple of years, many investors have cancelled their bookings and taken the money back. The company is in profit in every way as it deducts 20% of the money. These are some of the information we received from company sales representative orally and for spot viewing of irrelevant and misleading documents after repeated requests. These do not reflect on the status of the project. There is little hope and serious doubt, that the Company is not serious and sincere about executing the project. Our investment will then be just lost. Please wake up and ask for proof from the company.

      Please write a letter to the company and send by registered post with acknowledgement due asking for the following documents:

      (1) Copy of 7/12 extract of land on which the your building or plot is to located
      (2) Copy of Building proposal approved by the Town Planning Department, Alibaug
      (3) Allotment letter for your Flat/Plot
      (4) Copy of draft agreement for sale for registration of your booking (this is required to done on booking itself to protect your investment)
      (5) Copy of any latest approval or communication from any government department

      Some of the investors have come forward to form a discussion group. We welcome you to the eGroup for those who have booked Flats or Plots at Arrow City Manhattan at Pen, MahaMumbai. This is platform to share information and feedback among the Investors. The Company has nothing to do with this eGroup.

      We request the investors to join the group.
      To Join the discussion group for update and sharing, email to Arrowcity@googlegroups.com

      If you have any information, write to moderator at ArrowCity.MahaMumbai@gmail.com

      Please forward this email to everyone you know, who have invested in the project.

      Lets join hand to protect our interest collectively! Its our hard earned money!

  11. anup jain says:

    Sir, I have purchased a flat in december 2011 is my investment safe……pls reply.

  12. KrishMehra85 says:

    Hi Everyone,
    I have got 7/12 papers for the Arrow city project but I think it will not provide enough information to file an RTI so have requested more Information from Mr. Vineet Malhotra lets see whats his reply.

  13. mini says:

    I am not getting any replies to my recent emails to arrow city. I am planning to visit the site in November and will post an update.

    • arrowgroup says:

      dear where are your questions..we have not recieved any of your requests and please send it at: arrowsales9@gmail.com……
      we are eagerly waiting for you at site

      • Mumbaikar says:

        Hey Arrow Group ,

        Please advise why the sudden change in plan to change the township structure from 7 storey buidings to now 18 storey buildings. By when can we expect u to receive the approval from Town Planning dept for same. I have booked a 1BHK in your township & when asked to provide me a Copy of Building proposal approved by the Town Planning Department, Ive been told that a photo copy for same cannot be provided.

        • arrowgroup says:

          We have changed the plans for High storied buildings as all of the units in arrow city are affordable and it made sence to go vertical as higher floor catches premium and hence their is no price per sq feet increase.the govt. order for special township is their at office/site so please come to visit site to our cbd belapur office and take a copy of the same

          • Mumbaikar says:

            Thanks for your reply.
            The last i Visited your office few weeks back i was told a copy of order for special township cannot be provided. I will check again. Can you also tell me if you can by when will your company receive the approval to go ahead with construction of 18 storied towers & also project approvals from banks for finance assistance.

      • Ashfaq Khan says:

        Hello, Arrow Group,
        As i Hv gone through Above conversation

        my query as well as my fear of doubt increased a lot..
        1. Is this arrow city Manhattan Project is for defence Services Only?
        2. Is Ur Project is Well sensored nd authorised??
        3. Will ur company assure us nothing going wrong n or Investment are safe??

        sorry, as a Citizen of INDIA this is my Right for the information that i wanted to knw.
        no doubt ur project is awesome an unbelievable even i m willing to stay in ur flats..
        bt doubt should b cleared first ..

  14. Mumbaikar says:

    HEY ARROW GROUP

    IS THIS WHY U SHIFTED YOUR REGISTERED OFFICE TO PEN

    EOW raids Golden Tobacco and Arrow Engineering premises

    The Economic Offences Wing of Mumbai police on Wednesday conducted a search at the premises of Golden Tobacco Limited (GTL),and Arrow Engineering Limited,in connection with the criminal case filed against the two firms involving sale of a prime piece of land in Vile Parle.
    EOW Additional CP,Rajvardhan confirmed that the agency had conducted a search at GTL and Arrow Engineering and said important documents related to the case have been seized during the search.
    Golden Tobacco Limited (GTL) managing director J B Khetan,Chairman Sanjay Dalmiya,VC Anurag Dalmiya,Director (Finance) Ashok Joshi and shareholder Pramod Jain,and Arrow Engineering Company directors Tripta Malhotra,Vineet Malhotra and Natasha Malhotra have been booked by EOW under IPC sections 406 (criminal breach of trust),120 (B) (Criminal conspiracy) and 34 (Common intention ),at Juhu police station.
    The FIR has been registered following a complaint lodged by Sheth Developers.MUMBAI MIRROR BUREAU

  15. arrowgroup says:

    We had changed our registered office at pen as this project is the biggest of all projects we have done or would do. The shifting of registered office was done in year 2010 only.Regarding about vile parle land.. we have paid Rs 50 crores as advance to Golden tobacco ltd. for developing this property on 50:50 share ratio which includes finance/marketing/project management . Once the complaint was made we went to court and court observed we are outsiders in this case and gave us interim relef. These days most of builders are in financial bad shape so to resolve their civil issues which take years in court plan to pressurise other party by filing criminal complaints.But with honurable courts relief we are at peace. Our main bussiness is to buy/sell property ..so we do our work honestly

  16. Mumbaikar says:

    Hey Arrow Group.

    Thanks for replying.
    lemme tell you my intentions are not to bring harm to your Company’s reputation. Just that i have invested in Arrow City & wants to have all doubts cleared before i invest further.

  17. Vaijanti Kamble says:

    hi!

    Did any one visited the site recently.

  18. anonymous_comments says:

    Hi All,

    Arrow engineering is carrying out illigal land acquisition for it’s project in Pen. The land which they started comes under salt department(Central Govt.). Even there was news about it in Times of India.

    http://articles.timesofindia.indiatimes.com/2013-05-10/mumbai/39168572_1_salt-pan-salt-commissioner-cultivators.

    Please enquire fully before investing.

    Regards.

  19. kma05may says:

    I feel those who have not got possession as per Agreement in 24 months time should file his application in District Consumer Forum to get justice.The consumer will be compensated for delay in deficiency in services– Your Well Wisher

  20. kma05may says:

    I feel those who have not got possession as per Agreement in 24 months time should file a complaint in District Consumer Forum to get justice.The consumer will be compensated for delay in deficiency in services.Further ,there should be a common platform to fight and so those who all have booked in Arrow City Manhattan should come together and claim their hard earned money along with interest.Another option is to take help of mass media like TV,Newspaper to find out — Your Well Wisher

  21. kma05may says:

    I feel those who have not got possession as per Agreement in 24 months time should file a complaint in District Consumer Forum to get justice.The consumer will be compensated for delay in deficiency in services.Further ,there should be a common platform to fight and so those who all have booked in Arrow City Manhattan should come together and claim their hard earned money along with interest.Another option is to take help of mass media like TV,Newspaper to find out the truth and publish it in complaint column of newspaper. — Your Well Wisher

  22. arrowgroup says:

    Dear All the registeration process of land has started so please contact our office at Belapur . Secondly for apartments the time schedule given was 60 months we are very hopeful of completing that. Our machinery is all there at site and we are expecting pending approvals in next few weeks for apartments to be constructed at full speed.please visit site at pen for the same.

  23. arshad2475 says:

    Dear Arrowgroup,
    What are your plans for the plots that you have sold in 2007 and till date have not even registered or given possesion. Why is the delay if everything is in order.

  24. DavluvsU says:

    Dear arrow group,
    . As you said above for the apartments the time given was 60 months I have booked a 2BHK in Dec 2010 and I don’t think it will be ready by 2015. Also when I recently called the belapur office now they are saying, the construction is held because first it was under MMRDA and now it’s CIDCO is taking over, which I could not understand.

  25. nbalkrishna says:

    Dear DavluvsU,
    My case is same like yours, where I have paid full in 2010. now hey have come up with some plot exchange option & registration with complex agreement terms. What are your plans?

  26. vr136855 says:

    I have also paid (under down payment scheme)for 3 BHK in July 2010 and they have offered exchange of flat with plot. However the offer is not as per rate prevailing at the time of down payment,so I have not accepted offer and their calculation is as per FSI sharing with the co in 55% and 45%

    • nbalkrishna says:

      I think the plot agreement is not with individual but among group of 30-40 members. This offer is of no meaning. Have to wait and act in combine. Their belapur office is not replying correct scenario.

      • poorinvestor says:

        I think this offer is of no meaning and simply an eye wash.i think those who have not got timely possession of plot/flat should file complain in district consumer forum to get back our hard earned money with interest. we must act as a team.

        • DavluvsU says:

          Dear friends,
          . I have not aware about this offer of flat with plot exchange. Since I was not in Mumbai for the past two years,I could not visit the office,I was in touch with the belapur office on phone. Please let me know if you’ll are going to take any action.

  27. Mavrick says:

    Dear Friends !

    Well who so ever invested in Arrow City Manhattan, has been taken for a ride.

    Without wasting any more time all the persons who have invested should immediately form as group and start filing criminal cases against the owner & directors of the company by name, the owner has to be dealt in the same manner as Subrata Roy of Sahara.

    Otherwise forget your money ???

  28. Mavrick says:

    If we jointly take on the company we will have chance to get back our hard earned money with interest.

  29. DavluvsU says:

    Dear mavrick,
    . can you please mail me at the same ID. Its on gmail

  30. nbalkrishna says:

    My opinion is, we all come together and put pressure on builder for registration of documents and early possession, foreseeing the development of Pen area in near future. The appreciation will be high. We are not moneylenders to facilitate the builder our money on interest, he may agree that with nominal interest

    • sbc2604 says:

      Hello, I am also an investor for a 2BHK flat at the said Arrow city manhattan project. I am worried about my Money. As of now, I have only paid 20% (266000) in two slabs.. Will this project go ahead or its better to get money back??

  31. sbc2604 says:

    Hello,

    I have invested for a 2 BHK flat in a said project. will this project be completed or better to get the money back?? Please advise

  32. arrowgroup says:

    Hi Dear… We have completed appx 400 registerations of clients for land under jv .. Secondly we are waiting for some pending approvals from Naina Cidco .. We have applied to them but their masterplan process is still at planning stage. They have come out with a concept plan of 20 odd villages in panvel. This plan gives fsi of 1.7 . On sucess of this plan a new DCR and masterplan shall be there for rest of Naina cidco area . We except this to be there within few weeks or months after state elections in November 2014. We have already come above first floor for 7 buildings but the work has stopped to wait for pending approvals. We are completing concrete walls . Please visit our site at pen or download at http://www.arrowgroup.us . Secondly even transfer for people who have invested in booking of apartments and have paid booking amount is being done on Land registeration with Posession under JV format and approximately 125 have already been done. please contact me for details:

    Satish Sharma: 9930318502

  33. chanchal says:

    Hello all,

    Have you got any further update on to this property. I m thinking to file the case..
    If anybody wants to join pls let me know?

  34. montu says:

    Hi
    Even Im an investor in this project and i have so far invested 266000 so far.
    But i strongly believe that the project will take off once all the legalities are in place. If they wanted to cheat people like us then they would have wound up by now and ran away as so many other cheats have been doing. But they have stood the ground and have been replying to our queries. Lets show a little positivity and faith in them and keep our fingers crossed for things to move quickly.
    the very fact that they have been responding to our queries itself shows that their intentions are not malicious.

  35. jjjj says:

    Guys, the things are very hazy. Lets all get together and speak to the builder directly. Ask them to arrange for a meeting immediately.

  36. seriousbusiness says:

    Hi Guys,

    Like many others i too have been cheated by these sick Arrow City guys….My poor Dad had put all his retirement savings in this project. He was a simple man & trusted these cheates & paid them the full amount for a flat….Lil did he know that these kind of Crook Co’s only can survive in India…I am expecting this entire scam to be in the range of 400-700 Crores….Most of the suffering parties are either old age, retired civilians & army personnels.

    Enough is Enough, i have decided to file a Criminal Forgery case against this cos which on this forum itself has been giving false promises for the past 5-7 yrs….

    Guys i am up to salvage & get back my fathers hard earned money with full opportunity cost appreciation & wont settle for anything less than that.

    In case you want to come together in filing an FIR/Cheating Case against this company, pls write in to me salil.khanna333@gmail.com

  37. VNOD says:

    Hi friends,

    i visited the builders office last week. Some positive development happening. Sea Link and airport work starting soon. Cidco naina is about to finalise the plan.

    i m planning to do registration next week.

    regards

  38. jitenn says:

    I am in continuous touch with arrow office. They are starting work soon. Movement on govt infrastructure is also visible in news papers. i was informed recently about airport work and sea link that work will start soon…may be by this month.
    staff is very cordial. i have booked a plot and already executed the registration document.

  39. robinata says:

    Hello all

    I have also booked a plot with Arrow and getting call for plot registration. has anybody from this platform executed the plot agreement????
    These airport and sea link news seems to be positive news but all this we are hearing for a long time.
    Though I have faith in company and met with MD VINEET MALHOTRA and discussed about the future of the area and project and I found him very optimistic but only concern is delay from CIDCO and government policy.
    what are your views on this??

  40. patil22 says:

    Oh thats a gud news seems that our investments have started rolling on lets keep the fingers crossed.

  41. robinata says:

    I visited arrow office some days back because they approached me for registration of land.
    I asked them about the fake farmer certificate case then they showed me final order and clearance Tehsildar from that case that proved Mr vineet malhotra is a farmer by birth and hence lands purchased by him are valid . Moreover I feel that now these lands are in name of company ” Arrow Engineering Ltd” as Arrow ha got township permission
    But still no work at site and they told we are in process for approval only once Cidco master plan is ready they will submit the file for approval.
    After waiting for more than 5 years I decided to wait till Cidco master plan is ready then I will take a call weather to stay or sale my property.
    Want to know other views on the land registration as it looks that we should get the land rights registered on our name and then wait for Cidco clearance. Just see which more permissions I have to see apart from Copy of permissions given by Arrow..

  42. jitenn says:

    hi

    i got these permissions copies from arrow office

  43. robinata says:

    Hi
    Is there any news regarding development???
    One of my friend has done the registration of his plot..can any body update me on this ???

  44. robinata says:

    Dear all

    Any update of Arrow Manhattan???
    I went to arrow office to know the development.
    Arrow informed me that cidco has completed the master plan and soon they will upload this on cidco website for public suggestion so once master plan is ready they will approach cidco for permission.
    I Also asked then about the fake farmer certificate case.
    they told me that all clearence order for all the cases has been received from tehsildar and i have carried all the copy that i will upload.
    if any one has any development news about Arrow please share….

  45. jitenn says:

    Good news friends,

    Cidco has loaded the plan on their website. naina master plan

    https://cidco.maharashtra.gov.in/pdf/Combined_DCPR.pdf

    Welcome move. Hopefully under Modi govt we can see some rapid development now. Mr Devendra fadnavis said the Sea Link work will start by jan 2017, a big booster for the connectivity of this area. Airport work is also going on.

  46. jitenn says:

    hi

    got this message from ARROW:-

    Congrats.. Finally the draft Master plan has been announced and is put for public suggestions.. The main points for us are:
    1) Development of 1.7 FSI on surrender of 40% of land on minimum area of 25 hectares with very minimal government charges
    2) High Rise Buildings on 25 hectares allowed
    3) Land less than 25 hectares only .2 Fsi that also development permissible on minimum 10000 sq Mtrs plot area with high Government charges
    4) Metro, Multi Modal corridor, Internal Roads , local train , Trans Harbour bridge direct connectivity planned
    5) Special income tax benefits for affordable housing
    6) Salt Pan land development also allowed ( subject to special permission)

    Now let’s all enjoy and see our and your investments grow and multiply..

  47. INFY says:

    Congrats.. Finally the draft Master plan has been announced and is put for public suggestions.. The main points for us are:
    1) Development of 1.7 FSI on surrender of 40% of land on minimum area of 25 hectares with very minimal government charges
    2) High Rise Buildings on 25 hectares allowed
    3) Land less than 25 hectares only .2 Fsi that also development permissible on minimum 10000 sq Mtrs plot area with high Government charges
    4) Metro, Multi Modal corridor, Internal Roads , local train , Trans Harbour bridge direct connectivity planned
    5) Special income tax benefits for affordable housing
    6) Salt Pan land development also allowed ( subject to special permission)

    Now let’s all enjoy and see our and your investments grow and multiply..

  48. arrowgroup says:

    Dear all,

    This is to update you about the fake farmer cases. These cases were baseless as Tehsildaar has already cleared all 84-C cases. some sample copies of the order are attached herewith.

  49. jitenn says:

    I have already seen these documents but its good that builder has put everything here. I feel that delay was not intentional. Now draft master plan is out and i expect work to start soon.

  50. idealinvestment says:

    Dear Members,

    We are ready to buy registered units in Arrow Project at premium.

    Contact
    7900054625

  51. arrowgroup says:

    Respected Sir

    Finally Cidco has finalised the masterplan of 23 villages near panvel. It is there on the website. Masterplan for rest of NAINA would also be finalised by mid August ( public suggestions on draft masterplan over )on the same module as of 23 villages . So we request you to register the land ( if not done )under various formats ( as discussed)as soon as possible.

    Regards

    Vineet Malhotra
    Mob : 9811043519

    • Janardhan says:

      Dear Vineet,

      On 5th Aug 2017 I made a refund/cancellation request. Have submitted all required documents for this as well and was advised that the process will take 25 days and I will have my funds returned by a cheque. Ever since then I have not received. Can you please help?

  52. Janardhan says:

    Hi, Me and My father had purchased a 2BHK each at the Pen project. On 5th Aug 2017 I made a refund/cancellation request. Have submitted all required documents for this as well and was advised that the process will take 25 days and I will have my funds returned by a cheque. Ever since then I have not received any response. I am being told that it will take a bit longer as the MD (signing Authority) is not available due to legal issue.
    Can anyone please help?

  53. pinku75 says:

    Dear sir,

    I has try to call in office no one is there to pickup the phone. Even single mobile is not working. Website is not working. what happens. i have already done land registration in pen. whether this project is live or close. Any one give answer.

  54. susingh2020 says:

    sir,
    today i am tring to contact arrow team personnel on their mobile nos, but all are not reachables. the landline no is also not working. also the three mobile nos displayed in arrow city internet site is (i think) fake… as the call receivers are not entertaining my calls.

  55. KrishMehra85 says:

    Sad news to ALL,

    The Arrow city builder/developers are in police custody. The mobile link of news ‘https://m.timesofindia.com/city/navi-mumbai/navi-mumbai-2-builders-arrested-for-rs-2-5-crore-fraud/amp_articleshow/60725624.cms ‘ under news headline ” Navi Mumbai: 2 builders arrested for Rs 2.5 crore fraud
    Umesh K Parida | TNN |
    Sep 18, 2017, 05:29 IST “. The future of project is unknown and I as a general customer like you all is at loss of words.

  56. ctouch says:

    What is the latest news about this Arrowcity project? Anyone knows, please update me. I had sent mail but they have not responded! Thanks in advance.

  57. ctouch says:

    Update on Arrowcity Manhattan Project near Pen. I had visited their office at the CBD Belapur Railway Station Commercial complex today and talked with one of the persons in the office. I was told that the builders are still in Police Custody and are expected to know this month the outcome of the case (of fraud). Either to continue the project or return the money to the investors. I had advised them to keep the investors updated by email or sms. He has given me the contact nos of their office as: +91 22 41127700 and cell: +91 8558020585. We have to wait and see what happens.

  58. manishvyas says:

    Hello Everyone,
    I Manish Vyas also one of the investor in Arrocity project. Has anyone got any update on the project? Kindly share. I talked to Mr. Narang one of the spokesperson of Arrowcity & told me that builders are likely to came out this month and than only future action will be taken. I suggest we should take up this matter strongly. If any one has formed what’s app group kindly add my no.as well 995 8469 555.

  59. raphyleena says:

    Hi! Any update on the project.I too have invested in 2 plots of 200 SqYd each way back in Feb. 2009 and no communication from them. Please add me too in any follow up groups.
    My Mob.9969984799

  60. bharatbh says:

    I also want to be part of any group working with builder. I have booked 200 S Yards plot in Dec 2010.

    Bharat.Leo@gmail.com
    7048900995